The document set,
named at award

Every SCA engagement produces controlled documents under a defined numbering and revision scheme. You know at award exactly what lands in your hands, in what format, at what milestone.

Register

Standard deliverable register

Scope is selected from this register in the proposal. Anything not on the list is not in the fee, and anything on the list is.

Standard deliverable register
Deliverable Format Issued at What it answers
BODWordFront endWhat the system is being built to do, and on what assumptions.
UFRSWordFront endThe requirements the finished system will be tested against.
Control ArchitecturePDF / CADFront endControllers, networks, servers and boundaries on one sheet.
Instrument IndexExcelDesignEvery tag on the project, with service, range and document references.
Instrument SpecsExcel / PDFDesignProcurement-ready technical requirements per instrument.
I/O ListExcelDesignField device to rack, slot and channel assignment.
Panel Layout & BOMCAD / ExcelDesignWhat goes in the enclosure, where, and what it costs.
Control NarrativeWordSpecificationStartup, normal, shutdown and ESD behavior in sequence.
Cause & EffectExcelSpecificationWhich initiators trip which final elements, and to what state.
DDSWordSpecificationHow the logic, screens, alarms and records are actually built.
PLC / HMI PackageL5X / project filesConfigurationThe executable system, documented and version-controlled.
Alarm RationalizationExcelConfigurationWhy each alarm exists, its priority, and the operator response.
FAT ProcedureWordPre-shipmentProof the panel and code work before it leaves the shop.
SAT / Loop ChecksWord / ExcelFieldProof each installed loop reads and acts correctly.
Commissioning PlanWordStartupSequence, roles and sign-offs from mechanical completion to production.
Turnover PackagePDF setHandoverEverything above, as-built, indexed and issued to the owner.

Document control

How the set is governed

Every document carries

Project number Document number Revision Issue purpose (IFR / IFA / IFC) Revision history table Preparer and reviewer Client document number, where issued

Standing rules

Narrative, C&E and code reconciled at each issue Index, I/O list and program reconciled before FAT Comments returned in a tracked response log Revision allowance stated in the proposal Native files delivered, not PDF only

Want this register scoped against your project?

Request a scope review