Traceable requirements
Every requirement written down, numbered, and tested against at acceptance. Applied to a midstream compressor package, it means the FAT actually proves the narrative.
Home / Sectors
Sectors served
Practice built across regulated and unregulated process industries. The rigor that pharmaceutical validation demands is what makes a midstream turnover package still hold up at the next tie-in.
Coverage
| Sector | Typical facilities | Where SCA is usually engaged | Governing framework |
|---|---|---|---|
| Oil & Gas Midstream | Compressor stations, produced water facilities, RNG and LFG plants, booster stations, gathering | Greenfield controls packages, brownfield retrofits, multi-site as-built verification | API · ISA · IEC 61511 |
| Specialty Chemical | Blending systems, reactor and batch units, tank farms, loading racks | Recipe and phase logic, batch reporting, control system replacement | ISA-88 · ISA-18.2 |
| Pharmaceutical | API and drug product facilities, CIP/SIP skids, clean utilities | Requirements and design specifications, qualification support, OEM skid interface control | GAMP 5 · 21 CFR Part 11 |
| Consumer Products | Packaging and converting lines, filling lines, plant utilities | Line controls upgrades, legacy migration, downtime and OEE data collection | ISA-95 · ISA-101 |
| Water & Wastewater | Treatment plant expansions, lift stations, pump control systems | E/I&C project execution, panel and SCADA scope off the IFC set | TCEQ · ISA |
Cross-pollination
Working across five industries is not a breadth claim. It is where the method came from.
Every requirement written down, numbered, and tested against at acceptance. Applied to a midstream compressor package, it means the FAT actually proves the narrative.
Systems that have to run unattended on a bad comms link force clean alarm design, local fallback and honest failure states. Every sector benefits from that.
Batch work forces you to model the process as states and transitions rather than a pile of interlocks. That structure makes continuous plants far easier to troubleshoot.
Packaging lines make every second of downtime visible in dollars. It builds the habit of designing for fast diagnosis, not just correct operation.
A public utility has to produce compliance data on demand, years later, to someone who was not there. It sets a hard floor for how data logging and historization get designed.